<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.3 20210610//EN" "https://jats.nlm.nih.gov/publishing/1.3/JATS-journalpublishing1-3.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" article-type="research-article" dtd-version="1.3" xml:lang="en">
<front>
<journal-meta>
  <journal-id journal-id-type="publisher-id">50</journal-id>
  <journal-id journal-id-type="short-title">grr</journal-id>
  <journal-id journal-id-type="doi">10.31703/grr</journal-id>
  <journal-title-group>
    <journal-title>Global Regional Review</journal-title>
    <abbrev-journal-title abbrev-type="publisher">grr</abbrev-journal-title>
  </journal-title-group>
  <issn publication-format="print">2616-955X</issn>
  <issn publication-format="electronic">2663-7030</issn>
  <self-uri xlink:href="https://grrjournal.com"/>
  <publisher>
    <publisher-name>Humanity Publications</publisher-name>
    <publisher-loc>Pakistan</publisher-loc>
  </publisher>
</journal-meta>
<article-meta>
  <article-id pub-id-type="publisher-id">391423</article-id>
  <article-id pub-id-type="doi">10.31703/grr.2019(IV-II).47</article-id>
  <article-id pub-id-type="other" specific-use="submission-id">1892</article-id>
  <article-version article-version-type="publisher">1.0</article-version>
  <article-categories>
    <subj-group subj-group-type="heading">
      <subject>article</subject>
    </subj-group>
  </article-categories>
  <title-group>
    <article-title xml:lang="en">Knowledge Sharing Accelerates Success of Complex Projects: An Evidence from Pakistan</article-title>
  </title-group>
<contrib-group>
  <contrib contrib-type="author" seq="1" corresp="yes">
    <name>
      <surname>Jamil</surname>
      <given-names>Muryum</given-names>
    </name>
    <email>faroqahmad@gmail.com</email>
    <role vocab="credit" vocab-identifier="https://credit.niso.org/" vocab-term="Conceptualization" vocab-term-identifier="https://credit.niso.org/contributor-roles/conceptualization/">Conceptualization</role>
    <role vocab="credit" vocab-identifier="https://credit.niso.org/" vocab-term="Writing – original draft" vocab-term-identifier="https://credit.niso.org/contributor-roles/writing-original-draft/">Writing – original draft</role>
    <xref ref-type="aff" rid="aff1"/>
    <xref ref-type="corresp" rid="cor1"/>
  </contrib>
  <contrib contrib-type="author" seq="2">
    <name>
      <surname>Ahmad</surname>
      <given-names>Farooq</given-names>
    </name>
    <email>faroqahmad@gmail.com</email>
    <role vocab="credit" vocab-identifier="https://credit.niso.org/" vocab-term="Writing – review &amp; editing" vocab-term-identifier="https://credit.niso.org/contributor-roles/writing-review-editing/">Writing – review &amp; editing</role>
    <xref ref-type="aff" rid="aff2"/>
  </contrib>
  <contrib contrib-type="author" seq="3">
    <name>
      <surname>Mariam</surname>
      <given-names>Shahida</given-names>
    </name>
    <email>faroqahmad@gmail.com</email>
    <role vocab="credit" vocab-identifier="https://credit.niso.org/" vocab-term="Writing – review &amp; editing" vocab-term-identifier="https://credit.niso.org/contributor-roles/writing-review-editing/">Writing – review &amp; editing</role>
    <xref ref-type="aff" rid="aff3"/>
  </contrib>
  <aff id="aff1">
    <label>1</label>
    <institution-wrap>
      <institution>Faculty of Management Science, Riphah International University</institution>
    </institution-wrap>
    <named-content content-type="author-role">Student</named-content>
    <addr-line>Islamabad</addr-line>
    <country>Pakistan</country>
  </aff>
  <aff id="aff2">
    <label>2</label>
    <institution-wrap>
      <institution>Visiting Faculty, Faculty of Management Science, International Islamic University</institution>
    </institution-wrap>
    <addr-line>Islamabad</addr-line>
    <country>Pakistan</country>
  </aff>
  <aff id="aff3">
    <label>3</label>
    <institution-wrap>
      <institution>Librarian, Business &amp; Commerce, Government Institute of Commerce, Rawalpindi</institution>
    </institution-wrap>
    <addr-line>Punjab</addr-line>
    <country>Pakistan</country>
  </aff>
</contrib-group>
<author-notes>
  <corresp id="cor1">Corresponding Author: Muryum Jamil, Student,Faculty of Management Science,Riphah International University, Islamabad, Pakistan.. Email: <email>faroqahmad@gmail.com</email></corresp>
<fn fn-type="COI-statement" id="fn-coi">
  <p>The authors declare that they have no conflicts of interest.</p>
</fn>
<fn fn-type="ethics-statement" id="fn-ethics">
  <p>This study did not require formal ethics approval.</p>
</fn>
<fn fn-type="data-availability-statement" id="fn-data">
  <p>Data sharing is not applicable to this article.</p>
</fn>
</author-notes>
<pub-date pub-type="epub" date-type="pub" publication-format="electronic">
  <day>30</day>
  <month>06</month>
  <year>2019</year>
</pub-date>
<pub-date pub-type="collection">
  <month>06</month>
  <year>2019</year>
</pub-date>
<pub-date date-type="pub" publication-format="print">
  <day>16</day>
  <month>02</month>
  <year>2022</year>
</pub-date>
  <volume>4</volume>
  <issue>2</issue>
  <season>Spring</season>
  <fpage>438</fpage>
  <lpage>447</lpage>
  <history>
    <date date-type="accepted">
      <day>16</day>
      <month>02</month>
      <year>2022</year>
    </date>
  </history>
<funding-group>
  <funding-statement>
<p>The authors received no specific funding for this work.</p>
  </funding-statement>
</funding-group>
<permissions>
  <copyright-year>2019</copyright-year>
  <copyright-holder>Humanity Publications</copyright-holder>
  <license license-type="open-access" xml:lang="en" xlink:href="https://creativecommons.org/licenses/by/4.0/">
    <license-p>This is an open access article distributed under the terms of the Creative Commons Attribution 4.0 International License.</license-p>
  </license>
</permissions>
<self-uri content-type="text/html" xlink:href="https://grrjournal.com/article/Knowledge-Sharing-Accelerates-Success-of-Complex-Projects-An-Evidence-from-Pakistan"/>
<self-uri content-type="pdf" xlink:href="https://grrjournal.com/pdf/grr/4qRFiMrfqL.pdf"/>
<supplementary-material id="suppl-pdf" content-type="pdf" xlink:href="https://grrjournal.com/pdf/grr/4qRFiMrfqL.pdf">
  <label>PDF</label>
  <caption>
    <title>Full Text PDF</title>
  </caption>
</supplementary-material>
  <abstract>
    <p>We studies project complexity, knowledge sharing behavior, and project on project success in the context of project organizations in Rawalpindi and Islamabad. The data were collected from 326 employees working on multiple projects using reliable measures. Project complexity showed negative association with project success. Knowledge sharing pointed out a negative relationship with project complexity and a positive relationship with project success. Regression showed a positive contribution of project complexity and a positive role of knowledge sharing behaviour towards project success. We observed a positive interactive effect of knowledge sharing behaviour and project complexity on project success. Results indicate that complex projects are more likely to fail if knowledge sharing behaviours are not practiced at work. We suggest encouraging employees to share their knowledge and experiences for effective decision making and dealing with difficult situations ensuring the success of complex projects.</p>
  </abstract>
<kwd-group kwd-group-type="author-keywords">
  <kwd>Project Complexity</kwd>
  <kwd>Knowledge Sharing Behaviour</kwd>
  <kwd>Project Success.</kwd>
</kwd-group>
  <custom-meta-group>
    <custom-meta><meta-name>views</meta-name><meta-value>961</meta-value></custom-meta>
    <custom-meta><meta-name>downloads</meta-name><meta-value>1</meta-value></custom-meta>
    <custom-meta><meta-name>html-views</meta-name><meta-value>0</meta-value></custom-meta>
    <custom-meta><meta-name>google-scholar-citations</meta-name><meta-value>0</meta-value></custom-meta>
    <custom-meta><meta-name>crossref-citations</meta-name><meta-value>0</meta-value></custom-meta>
  </custom-meta-group>
</article-meta>
</front>
<body>
<sec id="sec-1">
  <title>Introduction</title>
<p>Project management refers to the use of proper tools, techniques, and well-structured procedures to manage all phases of projects (Bryde, 2003). Industrial development and globalization have increased the number of projects in different areas of all sectors including social, construction, information technology, human resources, and security sectors (Yatim, Bredilletand, &amp; Ruiz, 2009). Globally, project budgets and project-based management practices are increasing. The past two decades have witnessed quite a large number of projects where project management techniques have become inadequate to heave success (Signori &amp; Vismara, 2018). Especially, many unsuccessful projects have grown in the past ten years (Nawi, Rahman, &amp; Ibrahim, 2011). Increasing projects and associated complexity requires the acquisition of new skills for their management (Eveleens &amp; Verhoef, 2009).</p><p>The concept of project success carries greater importance; however, the idea of project management success is ambiguous for certain vague factors (Todorovi? et al., 2015) as most projects are organized in collaboration with multiple partners and contractors (Vidal, Marle, &amp; Bocquet, 2016). The project complexity is driven by the firm, unavoidable global forces, rapid technical advancements, and political as well as socio-economic change, etc. In profit-driven organizations, products decide the success or failure of projects. Some recent studies examined outcomes in the context of project complexity (Azim, 2010). While assessing uncertainty and complexity in the project, researchers generally engaged upon the real stages of the grouping of task multifaceted nature and complex framework hypothesis (Geraldi &amp; Adlbrecht, 2007). In this context, an instant study predicted project success through the convergence of knowledge sharing and project complexity.</p><p><break/></p><p>Problem Statement and Research Questions</p><p>Project success is likely to diminish with increased project complexity but this lacks empirical supports. Most of the studies supporting this contention lack evidence on this specific relationship which results in the reduced application of such findings (Luo, He, Xie, Yang, &amp; Wu, 2016). Multiple project success factors have been measured in different publications and research works (Cooke-Davies, 2002; Gunduz &amp; Yahya, 2018). However, each factor has generated a different impact on the success of the project. For instance, a study by Turner and Muller, (2005) identified project success factors including project mission, scheduling and planning, communication, troubleshooting, and support of top management, etc.; it is, however, imperative to consider that not every factor ensures the success of the project as some factors may lead to project failure. Out of all those factors, project complexity has emerged as a crucial separate factor negatively influencing project success. Over time, projects are expanding in size and becoming technically more sophisticated. Nowadays, the inclusion of diverse employees and stakeholders has increased the complexity of the project due to the addition of dissimilar aspects. That’s why complexity in projects has emerged as a fundamental factor that negatively influences success. In project-based organizations, multiple elements of complexity are affecting the performance and success of the project inversely. However, comprehensive evidence to understand project complexity is required. Accordingly, we posed the following research questions: -</p><p>1.	Whether and to what extent project complexity predicts project success?</p><p>2.	Whether and to what extent knowledge sharing behavior predicts project success?</p><p>3.	Whether and to what extent knowledge sharing behavior interacts with project complexity to determine project success?</p><p><break/></p><p>Significance of the Study</p><p>Our findings redound to project success considering that the negative impact of project complexities can be minimized through knowledge sharing behavior. The more an organization involves complexity in the project, the more the chances of project success reduce, and vice versa. Thus, project organizations practicing knowledge-sharing behavior may experience an increased likelihood of success. For researchers, practitioners, and academicians the study uncovers knowledge sharing behavior as a possible tool to avoid failures out of project complexity.</p>
</sec>
<sec id="sec-2">
  <title>Relevance to Literature</title>
<p>Project Success and Project Complexity</p><p>Project complexity refers to the difficulty in establishing structures and processes that needed appropriate cohesion of parts to articulate a whole and respond to changing conditions during the project cycle (Hirschman, 1967). It also considers the number and heterogeneity of different elements that inter-relate in a project (Burke &amp; Morley, 2016). The project success refers to the attainment of goals provided in a project and application of project management tools to achieve those goals within a predetermined scope, time, and cost (De Wit, 1988). The criteria to measure success varies with the size, uniqueness, and nature of complexities experienced by projects (Müller &amp; Turner, 2007).</p><p>The quantification of project complexity is difficult (Williams, 1999). The complexity of any type and nature reduces the efficiency, effectiveness, and success of the project (Boer, de Bruin, &amp; Verbraeck, 2009). The most common types of project complexities that significantly influence project success are known to be the organizational complexity and technological complexity (Baccarini, 1996). Several factors may lead to the failure of projects (Savolainen, Ahonen, &amp; Richardson, 2012). There are six-categories defining project complexity that influence project success directly or indirectly in a negative way; technological, goal, cultural, environmental, information, and organizational complexities (He et al., 2015).</p><p>Liu (1999) found that project complexity reduces project efficiency and thus project success. An empirical survey by McComb, Green, &amp; Compton (2007) found that flexibility and performance relationship is moderated by the complexity of the project. Project complexity also moderates the impact of leadership competencies on project success (Müller, Geraldi, &amp; Turner, 2011). They concluded that with an increase in project complexity the leadership competencies reduce and affect the project&apos;s success negatively. Williamson (2011) observed that complexity grounds for the difficulty of information technology projects which in turn directly influence their success. Thus, complexity may reduce the performance of projects. This offers a proposition that project complexity may be inversely associated with project success.</p><p>H1: Project complexity and project success are negatively correlated.</p><p><break/></p><p><break/></p><p>Project Success and Knowledge Sharing Behavior</p><p>Knowledge sharing in the context of project management refers to a mechanism indicating how individuals share, interpret, integrate, and apply their skills and experience to perform project tasks (Boh, 2007). It is explained as a behavior pursuing exchange of knowledge and it prevails in societies to differentiate the intellectual wealth, intelligence, and competitive edge (Liebowitz, 2001). Organizations need to implement certain policies and practices that are inevitable to achieve success. Knowledge sharing is an organizational tool to helps in the dissemination and use of such policies and practices to make a project successful (Reich, 2007). Moreover, knowledge sharing also reduces the costs involved in repeating the struggles required for problem-solving (Boh, 2007). It also fosters propagation between project illustrations and the creation of knowledge (Fong, 2003).</p><p>Knowledge can&apos;t be obtained in isolation, project managers encourage their employees to share their methods, inventions, and tactics they use in doing their tasks which is then practiced to resolve organizational issues and work more effectively (Wang, Su, &amp; Yang, 2011). This knowledge sharing behavior offers employees an opportunity to collectively work throughout the life cycle of the project (Wickrama &amp; Widyaratne, 2012). The quality of communication within teams is strongly and positively associated with knowledge sharing and improving team performance (Chen, Li, Clark, &amp; Dietrich, 2013). In any project organization, success for all stakeholders may be achieved by practicing knowledge sharing at team levels (Suppiah &amp; Sandhu, 2011; Park &amp; Lee, 2014). Employees&apos; attitude towards knowledge sharing encourages the smooth flow of information within and outside the organization and henceforth ensures project success in return. This supports a likely positive association of knowledge sharing behavior with project success.</p><p>H2: Knowledge sharing behavior has a positive effect on project success.</p><p><break/></p><p>Moderating Effect of Knowledge Sharing Behavior</p><p>Knowledge management has emerged as an essential apprehension. The development of any complex information system depends on knowledge sharing by those involved in it. In its vastest shape, the subject of the complex nature of the development process keeps on pulling in extensive research and re-assessment. The subsequent distributed work is not applied by development experts for its unpredictability or difficulty of use. To analyze this problem, Hussain et al. (2010) found that project complexity could be reduced if knowledge sharing behavior is facilitated through information modeling at all stages of project management.</p><p>In a construction project, the concept of the process of design is rapidly evolving appealing international procedures. It may create further complexity (Austin et al., 2002). Knowledge sharing can address and mitigate the problem of project complexity in any critical project. Choo et al., (2004) noted that challenges of complexity could be managed through proper flow of information and introducing different software that can assure knowledge sharing and flow of information throughout the project lifecycle. According to Suppiah and Sandhu (2011), project success desired by the stakeholders’ may be achieved by sharing proper knowledge with the team members timely. Reich, Gemino, &amp; Sauer (2012) pointed out that project knowledge emerges during activities performed in the organization. The knowledge sharing and coordination within project teams reduce the adverse impact of project complexity at all stages and cause project success. Therefore, organizations need to seek and share new knowledge for sustaining inventiveness (Andreeva &amp; Kianto, 2011). This leads to frame the following proposition:</p><p>H3: The link between project complexity and project success is moderated by knowledge sharing behavior in a way that complex projects are better handled and well managed.</p><p><break/></p><p>Theoretical Model</p><p>Drawing upon relevant literature, we conceptualized that interactive effect of project complexity and employees’ knowledge sharing behavior is likely to augment the success of complex projects. Figure 1 shows the framework for testing hypothesized relationships.</p>
</sec>
<sec id="sec-3">
  <title>Figure 1</title>
<p>Theoretical model</p>
</sec>
<sec id="sec-4">
  <title>Methodology</title>
<p>We adopted a quantitative research method to investigate the hypothetical relationships in this study. This approach is considered suitable for the analysis of relationships among variables and testing hypotheses (Cooper &amp; Schindler, 2006). The cross-sectional data were collected from project organizations in Rawalpindi and Islamabad using a survey questionnaire filled from management level project employees.</p><p><break/></p><p>Sampling Procedure and Sample</p><p>Population size remained unknown for the unknown number of projects being undertaken during the data collection time. Research suggests a bigger sample size to get more précised estimates which better represent population characteristics (Asiamah, Mensah, &amp; Oteng-Abayie (2017). We administered the questionnaire to randomly selected 500 employees in 10 target organizations; out of which 326 (65%) were received back constituting actual sample in this study; Shahoor Foundation (43), Oxfam (36), Aurat Foundation (35), Adam Smith (32), Globia Technologies (35), Commodity Inside (33), IPRS Consultants (34), PrideSofts (36), Deal and Deals (24), and Tripeworld (18). This was considered sufficient (Blair &amp; Zinkhan, 2006).</p><p><break/></p><p>Measures and Reliability</p><p>We collect data by adopting existing validated measures using used a 5-point Likert scale representing 1 for strongly disagree and 5 for strongly agree. Project complexity (? = .971) was measured using 15 items (Xia &amp; Lee, 2005). Knowledge sharing behavior (? = .855) was measured using 7 items (Teng &amp; Song, 2011). Project success (? = .910) was measured using 14 items (Aga, Noorderhaven &amp; Vallejo, 2016). All measures indicated a good level of reliability (?&gt;.700) as suggested by Nunally and Bernstein (1994).</p>
</sec>
<sec id="sec-5">
  <title>Results</title>
<p><bold>Sample Characteristics</bold></p><p>Information on four
demographic characteristics was collected to describe the sample; gender, age,
education, and experience. Participants included males (85.7%) and females
(14.3%) aging from 18 to 25 years (4.9%), 26 to 33 years (28.3%), 34 to 41
years (35.6%), 42 to 49 years (26.4%), and above 50 years (4.9%). The sample
indicated a good educational status; graduates (24.6%), postgraduates (54.7%),
and others (20.7%). The position level of participants indicated top managers
(27.4%), middle managers (55.6%), and lower managers (17%). Participants showed
a good level of professional experience as 1 to 5 years (21.9%), 6 to 10 years
(17.3%), 11 to 15 years (44.2%), 16 to 20 years (1.8%), and above 20 years
(9.7%).</p><p><bold>Correlation Matrix</bold></p><p>Correlation
coefficients (Table 1) were computed using SPSS 22 version to understand the
relationships proposed in the study model. Project complexity showed a negative
link with project success (r = -.381, p &lt; .01) meaning that higher the
project complexity lower may be the project success. The knowledge sharing
behavior showed a significant negative association with project complexity (r =
-.165, p&lt;.01) meaning that higher knowledge sharing may lessen the level of
project complexity. Knowledge sharing behavior revealed a positive linkage with
project success (r=.763, p&lt;.01) indicating that greater the knowledge
sharing by employees greater would be chances of project success.</p><p><bold>Table 1.</bold> Correlational
Outcomes (n=326)</p><table-wrap id="table1"><label>Table 1</label><caption><title>Table 1</title></caption><table><tbody><tr><td colspan="2" valign="top"> <p><bold>Variables</bold></p> </td><td> <p><bold>Items</bold></p> </td><td> <p><bold>Mean</bold></p> </td><td> <p><bold>Std. Deviation<sup></sup></bold></p> </td><td> <p><bold>1</bold></p> </td><td> <p><bold>2</bold></p> </td><td> <p><bold>3</bold></p> </td></tr><tr><td> <p>1.</p> </td><td> <p>Project complexity</p> </td><td> <p>15</p> </td><td> <p>4.18</p> </td><td> <p>.51</p> </td><td> <p>1</p> </td><td>  </td><td>  </td></tr><tr><td> <p>2.</p> </td><td> <p>Project success</p> </td><td> <p>7</p> </td><td> <p>3.47</p> </td><td> <p>1.02</p> </td><td> <p>-.381<sup>**</sup></p> </td><td> <p>1</p> </td><td>  </td></tr><tr><td> <p>3.</p> </td><td> <p>Knowledge sharing
  behaviour</p> </td><td> <p>14</p> </td><td> <p>3.35</p> </td><td> <p>.93</p> </td><td> <p>-.165<sup>**</sup></p> </td><td> <p>.763<sup>**</sup></p> </td><td> <p>1</p> </td></tr><tr><td colspan="8"> <p><sup>a</sup> <bold>**</bold> Significant at the .01
  level (2-tailed).</p> </td></tr></tbody></table></table-wrap><p><bold>Relationship between Project Complexity and Project Success</bold></p><p>Simple
linear regression was performed using project complexity (independent variable)
and project success (dependent variable). The outcomes (Model ‘a’ in Table 2)
suggested that project complexity explained a 16.2% change in project success
(R<sup>2</sup>=.162, p&lt;.001). The model also showed that each additional
one-unit change in project complexity has the power to bring a 72.6% negative
incremental change in project success (B=-.762, p&lt;.001). Hence, <italic>Hypothesis 1</italic>
was accepted indicating decreased project success with increasing project
complexity.</p><p><bold>Relationship between Project Success and Knowledge sharing Behaviour</bold></p><p>Simple
linear regression was performed using knowledge sharing behavior as an independent
variable and project success as the dependent variable. The outcomes (Model ‘b’
in Table 2) suggested that knowledge sharing behavior explained a 58.8% change
in project success (R<sup>2</sup>=.588, p&lt;.001). The model also showed that
each additional one-unit change in knowledge sharing behavior can positively
predict a 70.0% incremental change in project success (B=-.762, p&lt;.001).
Hence, <italic>Hypothesis 2</italic> was accepted indicating increase project success with increasing
knowledge sharing.</p><p><bold>The moderating role of knowledge sharing behavior </bold></p><p>Stepwise
regression analysis was performed to test the buffering effect of knowledge
sharing behavior on the complexity-success connection in projects. Project
complexity, knowledge sharing behavior, and their interaction term were entered
in step 1, step 2, and step 3, respectively. The results as shown in Model ‘c’
of Table 2 suggested that the model significantly explained 68.3% change in
project success (R<sup>2</sup>=.683, p&lt;.001). A significant negative
contribution of project complexity towards project success (B=.540, p&lt;.001)
was observed. Knowledge sharing behavior indicated significant positive
contributions in predicting project success (B=.786, p&lt;.001). The
interaction term of project complexity and knowledge sharing behavior revealed
a positive contribution to project success (B=.349, p&lt;.001). Hence, <italic>Hypothesis
3</italic> was accepted which means that knowledge sharing buffers the effects of
complexity on project success. The interaction plot showing this moderating
influence of knowledge sharing behavior is presented in Figure 2.</p><table-wrap id="table2"><label>Table 2</label><caption><title>Regression Outcomes (n=326)</title></caption><table><tbody><tr><td valign="top"> <p><bold>Model</bold></p> </td><td valign="top"> <p><bold>Predictor(s)</bold></p> </td><td> <p><bold>Mean ± SD</bold></p> </td><td> <p><bold>R<sup>2</sup></bold></p> </td><td> <p><bold>B</bold></p> </td></tr><tr><td valign="top"> <p>a.</p> </td><td valign="top"> <p>Project complexity (PC)</p> </td><td> <p>4.18 ± .51</p> </td><td> <p>.162<sup>**</sup></p> </td><td> <p>-.762<sup>**</sup></p> </td></tr><tr><td valign="top"> <p>b.</p> </td><td valign="top"> <p>Knowledge sharing behavior (KSB)</p> </td><td> <p>3.35 ± .93</p> </td><td> <p>.588<sup>**</sup></p> </td><td> <p>.700<sup>**</sup></p> </td></tr><tr><td valign="top"> <p>c.</p> </td><td valign="top"> <p>Step 1: Project complexity (PC)</p> <p>Step 2: Knowledge sharing behavior (KSB)</p> <p>Step 3: Interaction term (PC x KSB)</p> </td><td> <p>4.18 ± .51</p> <p>3.35 ± .93</p>  </td><td> <p>-</p> <p>.660<sup>**</sup></p> <p>.683<sup>**</sup></p> </td><td> <p>-.540<sup>**</sup></p> <p>.786<sup>**</sup></p> <p>.349<sup>**</sup></p> </td></tr></tbody></table></table-wrap><p>*P&lt;0.01, SD = Standard deviation</p><p>Dependent variable:  Project
success (PS)</p><p>Equation 1: PS = -.762(PC)
+ e</p><p>Equation 2: PS =
.700 (KSB) + e</p><p>Equation 3: PS =
-.540(PC)+.786(KSB)+.349(PCxKSB)</p>
</sec>
<sec id="sec-6">
  <title>Figure 2</title>
<p>Moderating Effects of Knowledge Management</p><p>Model Fit</p><p>Model fitness was examined using AMOS software. The results explained that covariance between the variables project complexity (independent variable), project success (dependent variable), and knowledge sharing behavior (moderating variable) is good being less than the threshold of .800 (Albright &amp; Park, 2009). Factor loadings or regression weights were found to be less than 1 (Yong &amp; Pearce, 2013). The values of TLI (.963), CFI (.972), RMSEA (.054), GFI (.902), and CMIN/df or chi-square value of 1.376 being in respective acceptable ranges showed a good level of model fitness.</p>
</sec>
<sec id="sec-7">
  <title>Discussion</title>
<p>Project Complexity as A Negative Predictor of Success in Projects</p><p>We found that project complexity negatively associates with project success which confirms prior research (Kennedy et al., 2011; Williamson, 2011). Müller, Geraldi, &amp; Turner (2011) identified that any complexity in a project influences the manager’s performance and henceforth reduces the probability of project success. The project managers must develop an effective program to manage project complexity effectively to reach project success. Proper coordination and effective communication among members of project teams are the important tools that could resolve the issue of project complexity at initial stages (Baccarini, 1996; Laufer, Denker, &amp; Shenhar, 1996). Smith &amp; Graetz (2006) suggested that the theory of project complexity is ambiguous to understand, but its application can escalate success. The use of complexity theory requires a complete experience to understand the problems that can trigger project failure.</p><p><break/></p><p>Knowledge sharing as a Positive Predictor of Project Success</p><p>Our findings suggest that increasing knowledge sharing behavior increases the chances of project success. This supports previous research showing a positive bond between knowledge sharing behavior and project success (Niedergassel, 2011). The current study highlights the standing of knowledge sharing in a project organization where people work and interact in teams. These results are in line with the study of (Almeida &amp; Soares, 2014) which concluded that knowledge sharing throughout the project provides an opportunity to take advantage of situational learning and avoid the repetition of mistakes to improve the performance. Mentoring and rotation at a job can help the transfer of knowledge without involving organizational level mechanisms (Kamara, Anumba, &amp; Carrillo, 2008).</p><p><break/></p><p>Knowledge sharing behavior as a Moderator</p><p>The likelihood of project success can be maximized through knowledge sharing which minimizes negative impacts of project complexity. Knowledge sharing is known to minimize the costs associated with repeated efforts applied for problem-solving in any organization, and henceforth ensures the success of the project (Boh, 2007). This study reveals that knowledge sharing can be beneficial for the successful management of project organizations. The person to person knowledge sharing is a critical element to consider. The research finds that knowledge sharing aides in maintaining a strategic distance from the errors and decreases the expense of products or benefits and builds up the ability to develop (Iqbal et al., 2011). The more an organization reduces the errors, the more it gets successful in eliminating the adverse effects of complexity in the project. This supports social learning theory (Miller &amp; Dollard, 1941). The theory helps in improving learning capabilities i.e. knowledge sharing behavior needed to improve project performance by reducing project complexities which enable the organization to reach desired project success.</p>
</sec>
<sec id="sec-8">
  <title>Conclusion</title>
<p>Based on empirical findings derived from this study, we concluded that project complexity has the power to negatively influence project success. Knowledge sharing behavior has the potential to positively contribute towards project success as well as the power to converge with project complexity in a way that reduces its negative impact on project success by playing a positive moderating role. The study suggests that project managers should encourage employees for sharing their knowledge and experiences to effectively deal with difficult situations at work.</p>
</sec>
<sec id="sec-9">
  <title>Limitations and Future Research</title>
<p>The sample was drawn from selected project organizations in Rawalpindi and Islamabad only. To gain better insights into the proposed relationship, further research is needed by involving a larger sample size from a diverse set of project organizations in other geographic areas as well especially in Pakistan. Future research is also needed to explore possible mediators to explain the process of how and why project complexity negatively influences project success. There is also a need to examine other possible mechanisms and conditions for a better understanding of complexity-success link, minimizing negative influences of complexity, achieving desired outcomes in projects.</p>
</sec>
</body>
<back>
<fn-group content-type="conflict-of-interest">
  <title>Conflict of Interest</title>
  <fn fn-type="conflict">
<p>The authors declare that they have no conflicts of interest.</p>
  </fn>
</fn-group>
<fn-group content-type="ethics-statement">
  <title>Ethics Statement</title>
  <fn fn-type="ethics">
<p>This study did not require formal ethics approval.</p>
  </fn>
</fn-group>
<fn-group content-type="data-availability">
  <title>Data Availability</title>
  <fn fn-type="data-availability-statement">
<p>Data sharing is not applicable to this article.</p>
  </fn>
</fn-group>
<app-group>
  <app id="app-suppl">
    <title>Supplementary Materials</title>
<supplementary-material id="suppl-pdf" content-type="pdf" xlink:href="https://grrjournal.com/pdf/grr/4qRFiMrfqL.pdf">
  <label>PDF</label>
  <caption>
    <title>Full Text PDF</title>
  </caption>
</supplementary-material>
  </app>
</app-group>
<ref-list>
  <title>References</title>
<ref id="Aga">
  <label>1</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Aga, D. A., Noorderhaven, N., &amp; Vallejo, B</person-group>
    <year>2016</year>
    <source>Transformational leadership and project success: The mediating role of team-building.International Journal of Project Management</source>
    <volume>34</volume>
    <issue>5</issue>
    <fpage>806</fpage>
    <lpage>818</lpage>
    Aga, D. A., Noorderhaven, N., &amp; Vallejo, B. (2016). Transformational leadership and project success: The mediating role of team-building.International Journal of Project Management,34(5), 806-818
  </mixed-citation>
</ref>
<ref id="Almeida">
  <label>2</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Almeida, M. V., &amp; Soares, A. L</person-group>
    <year>2014</year>
    <source>Knowledge sharing in project-based organizations: Overcoming the informational limbo.International Journal of Information Management</source>
    <volume>34</volume>
    <issue>6</issue>
    <fpage>770</fpage>
    <lpage>779</lpage>
    Almeida, M. V., &amp; Soares, A. L. (2014). Knowledge sharing in project-based organizations: Overcoming the informational limbo.International Journal of Information Management,34(6), 770-779.
  </mixed-citation>
</ref>
<ref id="Andreeva">
  <label>3</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Andreeva, T., &amp;Kianto, A</person-group>
    <year>2011</year>
    <source>Knowledge processes, knowledge-intensity and innovation: a moderated mediation analysis.Journal of Knowledge Management</source>
    <volume>15</volume>
    <issue>6</issue>
    <fpage>1016</fpage>
    <lpage>1034</lpage>
    Andreeva, T., &amp;Kianto, A. (2011). Knowledge processes, knowledge-intensity and innovation: a moderated mediation analysis.Journal of Knowledge Management,15(6), 1016-1034.
  </mixed-citation>
</ref>
<ref id="Asiamah">
  <label>4</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Asiamah, N., Mensah, H. K., &amp; Oteng-Abayie, E. F</person-group>
    <year>2017</year>
    <source>Do larger samples really lead to more precise estimates? A simulation studies.American Journal of Educational Research</source>
    <volume>5</volume>
    <issue>1</issue>
    <fpage>9</fpage>
    <lpage>17</lpage>
    Asiamah, N., Mensah, H. K., &amp; Oteng-Abayie, E. F. (2017). Do larger samples really lead to more precise estimates? A simulation studies.American Journal of Educational Research,5(1), 9-17
  </mixed-citation>
</ref>
<ref id="Austin">
  <label>5</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Austin, S., Newton, A., Steele, J., &amp;Waskett, P</person-group>
    <year>2002</year>
    <source>Modeling and managing project complexity.International Journal of project management</source>
    <volume>20</volume>
    <issue>3</issue>
    <fpage>191</fpage>
    <lpage>198</lpage>
    Austin, S., Newton, A., Steele, J., &amp;Waskett, P. (2002). Modeling and managing project complexity.International Journal of project management,20(3), 191-198.
  </mixed-citation>
</ref>
<ref id="Azim">
  <label>6</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Azim, S. W</person-group>
    <year>2010</year>
    <source>Understanding and managing project complexity(Doctoral dissertation, University of Manchester)</source>
    <page-range>roject</page-range>
    Azim, S. W. (2010).Understanding and managing project complexity(Doctoral dissertation, University of Manchester)
  </mixed-citation>
</ref>
<ref id="Baccarini">
  <label>7</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Baccarini, D</person-group>
    <year>1996</year>
    <source>The concept of project complexity -a review.International journal of project management</source>
    <volume>14</volume>
    <issue>4</issue>
    <fpage>201</fpage>
    <lpage>204</lpage>
    Baccarini, D. (1996). The concept of project complexity -a review.International journal of project management,14(4), 201-204.
  </mixed-citation>
</ref>
<ref id="Blair">
  <label>8</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Blair, E., &amp; Zinkhan, G. M</person-group>
    <year>2006</year>
    <source>From the editor: nonresponse and generalizability in academic research</source>
    Blair, E., &amp; Zinkhan, G. M. (2006). From the editor: nonresponse and generalizability in academic research.
  </mixed-citation>
</ref>
<ref id="Boer">
  <label>9</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Boer, C. A., de Bruin, A., &amp; Verbraeck, A</person-group>
    <year>2009</year>
    <source>A survey on distributed simulation in industry.Journal of Simulation</source>
    <volume>3</volume>
    <issue>1</issue>
    <fpage>3</fpage>
    <lpage>16</lpage>
    Boer, C. A., de Bruin, A., &amp; Verbraeck, A. (2009). A survey on distributed simulation in industry.Journal of Simulation,3(1), 3-16.
  </mixed-citation>
</ref>
<ref id="Boh">
  <label>10</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Boh, W. F</person-group>
    <year>2007</year>
    <source>Mechanisms for sharing knowledge in project-based organizations.Information and organization</source>
    <volume>17</volume>
    <issue>1</issue>
    <fpage>27</fpage>
    <lpage>58</lpage>
    Boh, W. F. (2007). Mechanisms for sharing knowledge in project-based organizations.Information and organization,17(1), 27-58.
  </mixed-citation>
</ref>
<ref id="Bryde">
  <label>11</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Bryde, D. J</person-group>
    <year>2003</year>
    <source>Project management concepts, methodsand application.International Journal of Operations &amp; Production Management</source>
    <volume>23</volume>
    <issue>7</issue>
    <fpage>775</fpage>
    <lpage>793</lpage>
    Bryde, D. J. (2003). Project management concepts, methodsand application.International Journal of Operations &amp; Production Management,23(7), 775-793
  </mixed-citation>
</ref>
<ref id="Burke">
  <label>12</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Burke, C. M., &amp; Morley, M. J</person-group>
    <year>2016</year>
    <source>On temporary organizations: A review, synthesis and research agenda.Human relations</source>
    <volume>69</volume>
    <issue>6</issue>
    <fpage>1235</fpage>
    <lpage>1258</lpage>
    Burke, C. M., &amp; Morley, M. J. (2016). On temporary organizations: A review, synthesis and research agenda.Human relations,69(6), 1235-1258.
  </mixed-citation>
</ref>
<ref id="Chen">
  <label>13</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Chen, X., Li, X., Clark, J. G., &amp; Dietrich, G. B</person-group>
    <year>2013</year>
    <source>Knowledge sharing in open source software project teams: A transactive memory system perspective.International Journal of Information Management</source>
    <volume>33</volume>
    <issue>3</issue>
    <fpage>553</fpage>
    <lpage>563</lpage>
    Chen, X., Li, X., Clark, J. G., &amp; Dietrich, G. B. (2013). Knowledge sharing in open source software project teams: A transactive memory system perspective.International Journal of Information Management,33(3), 553-563
  </mixed-citation>
</ref>
<ref id="Choo">
  <label>14</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Choo, H. J., Hammond, J., Tommelein, I. D., Austin, S.A., &amp; Ballard, G</person-group>
    <year>2004</year>
    <source>DePlan: a tool for integrated design management.Automation in Construction</source>
    <volume>13</volume>
    <issue>3</issue>
    <fpage>313</fpage>
    <lpage>326</lpage>
    Choo, H. J., Hammond, J., Tommelein, I. D., Austin, S.A., &amp; Ballard, G. (2004). DePlan: a tool for integrated design management.Automation in Construction,13(3), 313-326
  </mixed-citation>
</ref>
<ref id="CookeDavies">
  <label>15</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Cooke-Davies, T</person-group>
    <year>2002</year>
    <source>The real success factors on projects.International journal of project management</source>
    <volume>20</volume>
    <issue>3</issue>
    <fpage>185</fpage>
    <lpage>190</lpage>
    Cooke-Davies, T. (2002). The real success factors on projects.International journal of project management,20(3), 185-190
  </mixed-citation>
</ref>
<ref id="Cooper">
  <label>16</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Cooper, D.R., &amp; Schindler, P. S</person-group>
    <year>2006</year>
    <source>Business research methods: Empirical investigation.Journal of service research</source>
    <volume>1</volume>
    <issue>2</issue>
    <fpage>108</fpage>
    <lpage>28</lpage>
    Cooper, D.R., &amp; Schindler, P. S. (2006). Business research methods: Empirical investigation.Journal of service research,1(2), 108-28.
  </mixed-citation>
</ref>
<ref id="De">
  <label>17</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">De Wit, A</person-group>
    <year>1988</year>
    <source>Measurement of project success.International journal of project management</source>
    <volume>6</volume>
    <issue>3</issue>
    <fpage>164</fpage>
    <lpage>170</lpage>
    De Wit, A. (1988). Measurement of project success.International journal of project management,6(3), 164-170.
  </mixed-citation>
</ref>
<ref id="Eveleens">
  <label>18</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Eveleens, J. L., &amp;Verhoef, C</person-group>
    <year>2009</year>
    <source>The rise and fall of the chaos report figures.IEEE software, (1), 30-36</source>
    Eveleens, J. L., &amp;Verhoef, C. (2009). The rise and fall of the chaos report figures.IEEE software, (1), 30-36
  </mixed-citation>
</ref>
<ref id="Fong">
  <label>19</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Fong, P. S</person-group>
    <year>2003</year>
    <source>Knowledge creation in multidisciplinary project teams: an empirical study of the processes and their dynamic interrelationships.InternationalJournal of Project Management</source>
    <volume>21</volume>
    <issue>7</issue>
    <fpage>479</fpage>
    <lpage>486</lpage>
    Fong, P. S. (2003). Knowledge creation in multidisciplinary project teams: an empirical study of the processes and their dynamic interrelationships.InternationalJournal of Project Management,21(7), 479-486.
  </mixed-citation>
</ref>
<ref id="Geraldi">
  <label>20</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Geraldi, J. G., &amp; Adlbrecht, G</person-group>
    <year>2007</year>
    <source>On faith, fact, and interaction in projects.Project Management Journal</source>
    <volume>38</volume>
    <issue>1</issue>
    <fpage>32</fpage>
    <lpage>43</lpage>
    Geraldi, J. G., &amp; Adlbrecht, G. (2007). On faith, fact, and interaction in projects.Project Management Journal,38(1), 32-43.
  </mixed-citation>
</ref>
<ref id="Gunduz">
  <label>21</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Gunduz, M., &amp; Yahya, A. M. A</person-group>
    <year>2018</year>
    <source>Analysis of project success factors in construction industry.Technological and Economic Development of Economy</source>
    <volume>24</volume>
    <issue>1</issue>
    <fpage>67</fpage>
    <lpage>80</lpage>
    Gunduz, M., &amp; Yahya, A. M. A. (2018). Analysis of project success factors in construction industry.Technological and Economic Development of Economy,24(1), 67-80
  </mixed-citation>
</ref>
<ref id="He">
  <label>22</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">He, Q., Luo, L., Hu, Y., &amp; Chan, A. P</person-group>
    <year>2015</year>
    <source>Measuring the complexity of mega construction projects in China-A fuzzy analytic network process analysis.International Journal of Project Management</source>
    <volume>33</volume>
    <issue>3</issue>
    <fpage>549</fpage>
    <lpage>563</lpage>
    He, Q., Luo, L., Hu, Y., &amp; Chan, A. P. (2015). Measuring the complexity of mega construction projects in China-A fuzzy analytic network process analysis.International Journal of Project Management,33(3), 549-563.
  </mixed-citation>
</ref>
<ref id="Hirschman">
  <label>24</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Hirschman, A. O</person-group>
    <year>1967</year>
    <source>The principle of the hiding hand.The public interest</source>
    <page-range>rinciple</page-range>
    Hirschman, A. O. (1967). The principle of the hiding hand.The public interest,6, 10
  </mixed-citation>
</ref>
<ref id="Hussain">
  <label>25</label>
  <mixed-citation publication-type="journal">
    <article-title>Hussain, H., Conner, L., Jansen, C., &amp; Mayo, E</article-title>
    <source>(2010, 6-9 Dec 2010). Exploring emergence in complexity research: Comparison of emergence across projects. Paper presented at the NZARE conference and annual meeting</source>
    <page-range>rojects</page-range>
    Hussain, H., Conner, L., Jansen, C., &amp; Mayo, E. (2010, 6-9 Dec 2010). Exploring emergence in complexity research: Comparison of emergence across projects. Paper presented at the NZARE conference and annual meeting 2010, Auckland
  </mixed-citation>
</ref>
<ref id="Iqbal">
  <label>26</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Iqbal, M. J., Rasli, A., Heng, L. H., Ali, M. B. B., Hassan, I., &amp;Jolaee, A</person-group>
    <year>2011</year>
    <source>Academicstaff knowledge sharing intentions and university innovation capability.African Journal of Business Management</source>
    <volume>5</volume>
    <issue>27</issue>
    <fpage>11051</fpage>
    <lpage>11059</lpage>
    Iqbal, M. J., Rasli, A., Heng, L. H., Ali, M. B. B., Hassan, I., &amp;Jolaee, A. (2011). Academicstaff knowledge sharing intentions and university innovation capability.African Journal of Business Management,5(27), 11051-11059
  </mixed-citation>
</ref>
<ref id="Kamara">
  <label>27</label>
  <mixed-citation publication-type="journal">
    <article-title>Kamara, J., Anumba, C., &amp; Carrillo, P</article-title>
    <source>M. 2008. Cross-Project Knowledge Management. In C. J., C. E. Anumba, &amp; P. M. Carrillo (Eds.), Knowledge Management in Construction. Oxford: Blackwell Publishing</source>
    <page-range>M</page-range>
    Kamara, J., Anumba, C., &amp; Carrillo, P. M. 2008. Cross-Project Knowledge Management. In C. J., C. E. Anumba, &amp; P. M. Carrillo (Eds.), Knowledge Management in Construction. Oxford: Blackwell Publishing
  </mixed-citation>
</ref>
<ref id="Kennedy">
  <label>28</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Kennedy, D. M., McComb, S. A., &amp;Vozdolska, R. R</person-group>
    <year>2011</year>
    <source>Aninvestigation of project complexity&apos;s influence on team communication using Monte Carlo simulation.Journal of Engineering and Technology Management</source>
    <volume>28</volume>
    <issue>3</issue>
    <fpage>109</fpage>
    <lpage>127</lpage>
    Kennedy, D. M., McComb, S. A., &amp;Vozdolska, R. R. (2011). Aninvestigation of project complexity&apos;s influence on team communication using Monte Carlo simulation.Journal of Engineering and Technology Management,28(3), 109-127
  </mixed-citation>
</ref>
<ref id="Laufer">
  <label>29</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Laufer, A., Denker, G. R., &amp;Shenhar, A. J</person-group>
    <year>1996</year>
    <source>Simultaneous management: the key to excellence in capital projects.International Journal of Project Management</source>
    <volume>14</volume>
    <issue>4</issue>
    <fpage>189</fpage>
    <lpage>199</lpage>
    Laufer, A., Denker, G. R., &amp;Shenhar, A. J. (1996). Simultaneous management: the key to excellence in capital projects.International Journal of Project Management,14(4), 189-199.
  </mixed-citation>
</ref>
<ref id="Liebowitz">
  <label>30</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Liebowitz, J</person-group>
    <year>2001</year>
    <source>Knowledge management and its link to artificial intelligence.Expert systems with applications</source>
    <volume>20</volume>
    <issue>1</issue>
    <fpage>1</fpage>
    <lpage>6</lpage>
    Liebowitz, J. (2001). Knowledge management and its link to artificial intelligence.Expert systems with applications,20(1), 1-6
  </mixed-citation>
</ref>
<ref id="Liu">
  <label>31</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Liu, A. M</person-group>
    <year>1999</year>
    <source>A research model of project complexity and goal commitment effects on project outcome.Engineering, Construction and Architectural Management</source>
    <volume>6</volume>
    <issue>2</issue>
    <fpage>105</fpage>
    <lpage>111</lpage>
    Liu, A. M. (1999). A research model of project complexity and goal commitment effects on project outcome.Engineering, Construction and Architectural Management,6(2), 105-111
  </mixed-citation>
</ref>
<ref id="Luo">
  <label>32</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Luo, L., He, Q., Xie, J., Yang, D., &amp; Wu, G</person-group>
    <year>2016</year>
    <source>Investigating the relationship between project complexity and success in complex construction projects.Journal of Management in Engineering</source>
    <volume>33</volume>
    <issue>2</issue>
    <fpage>04016036</fpage>
    Luo, L., He, Q., Xie, J., Yang, D., &amp; Wu, G. (2016). Investigating the relationship between project complexity and success in complex construction projects.Journal of Management in Engineering,33(2), 04016036
  </mixed-citation>
</ref>
<ref id="McComb">
  <label>33</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">McComb, S. A., Green, S. G., &amp; Compton, W. D</person-group>
    <year>2007</year>
    <source>Team flexibility&apos;s relationship to staffing and performancein complex projects: An empirical analysis.Journal of Engineering and Technology Management</source>
    <volume>24</volume>
    <issue>4</issue>
    <fpage>293</fpage>
    <lpage>313</lpage>
    McComb, S. A., Green, S. G., &amp; Compton, W. D. (2007). Team flexibility&apos;s relationship to staffing and performancein complex projects: An empirical analysis.Journal of Engineering and Technology Management,24(4), 293-313.
  </mixed-citation>
</ref>
<ref id="Miller">
  <label>34</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Miller, N. E., &amp; Dollard, J</person-group>
    <year>1941</year>
    <article-title>. Social learning and imitation</article-title>
    <source>New Haven: Yale University. Press</source>
    <page-range>ress</page-range>
    Miller, N. E., &amp; Dollard, J. (1941). Social learning and imitation. New Haven: Yale University. Press
  </mixed-citation>
</ref>
<ref id="ref-35">
  <label>35</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">MÃƒÂ¼ller, R., &amp; Turner, R</person-group>
    <year>2007</year>
    <source>Theinfluence of project managers on project success criteria and project success by type of project.European management journal</source>
    <volume>25</volume>
    <issue>4</issue>
    <fpage>298</fpage>
    <lpage>309</lpage>
    MÃƒÂ¼ller, R., &amp; Turner, R. (2007). Theinfluence of project managers on project success criteria and project success by type of project.European management journal,25(4), 298-309.
  </mixed-citation>
</ref>
<ref id="ref-36">
  <label>36</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">MÃƒÂ¼ller, R., Geraldi, J., &amp; Turner, J. R</person-group>
    <year>2011</year>
    <source>Relationships between leadership and success in different types of project complexities.IEEE Transactions on Engineering Management</source>
    <volume>59</volume>
    <issue>1</issue>
    <fpage>77</fpage>
    <lpage>90</lpage>
    MÃƒÂ¼ller, R., Geraldi, J., &amp; Turner, J. R. (2011). Relationships between leadership and success in different types of project complexities.IEEE Transactions on Engineering Management,59(1), 77-90
  </mixed-citation>
</ref>
<ref id="Niedergassel">
  <label>38</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Niedergassel, B., &amp;Leker, J</person-group>
    <year>2011</year>
    <source>Different dimensions of knowledge in cooperative R&amp;D projects of university scientists.Technovation</source>
    <volume>31</volume>
    <issue>4</issue>
    <fpage>142</fpage>
    <lpage>150</lpage>
    Niedergassel, B., &amp;Leker, J. (2011). Different dimensions of knowledge in cooperative R&amp;D projects of university scientists.Technovation,31(4), 142-150
  </mixed-citation>
</ref>
<ref id="Nunally">
  <label>39</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Nunally, J.C., &amp; Bernstein, I.H</person-group>
    <year>1994</year>
    <article-title>. Psychometric theory</article-title>
    <source>New York: McGraw-Hill</source>
    <page-range>sychometric</page-range>
    Nunally, J.C., &amp; Bernstein, I.H. (1994). Psychometric theory. New York: McGraw-Hill
  </mixed-citation>
</ref>
<ref id="Park">
  <label>40</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Park, J. G., &amp; Lee, J</person-group>
    <year>2014</year>
    <source>Knowledge sharing in information systems development projects: Explicating the role of dependence and trust.International Journal of Project Management</source>
    <volume>32</volume>
    <issue>1</issue>
    <fpage>153</fpage>
    <lpage>165</lpage>
    Park, J. G., &amp; Lee, J. (2014). Knowledge sharing in information systems development projects: Explicating the role of dependence and trust.International Journal of Project Management,32(1), 153-165
  </mixed-citation>
</ref>
<ref id="Reich">
  <label>41</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Reich, B. H</person-group>
    <year>2007</year>
    <source>Managing knowledge and learning in IT projects: A conceptual framework and guidelines for practice.Project Management Journal</source>
    <volume>38</volume>
    <issue>2</issue>
    <fpage>5</fpage>
    <lpage>17</lpage>
    Reich, B. H. (2007). Managing knowledge and learning in IT projects: A conceptual framework and guidelines for practice.Project Management Journal,38(2), 5-17
  </mixed-citation>
</ref>
<ref id="Savolainen">
  <label>43</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Savolainen, P., Ahonen, J. J., &amp; Richardson, I</person-group>
    <year>2012</year>
    <source>Software development project success and failure from the supplier&apos;s perspective: A systematic literature review.International Journal of Project Management</source>
    <volume>30</volume>
    <issue>4</issue>
    <fpage>458</fpage>
    <lpage>469</lpage>
    Savolainen, P., Ahonen, J. J., &amp; Richardson, I. (2012). Software development project success and failure from the supplier&apos;s perspective: A systematic literature review.International Journal of Project Management,30(4), 458-469
  </mixed-citation>
</ref>
<ref id="Signori">
  <label>44</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Signori, A., &amp; Vismara, S</person-group>
    <year>2018</year>
    <source>Does success bring success? The post-offering lives of equity-crowdfunded firms.Journal of Corporate Finance</source>
    <volume>50</volume>
    <fpage>575</fpage>
    <lpage>591</lpage>
    Signori, A., &amp; Vismara, S. (2018). Does success bring success? The post-offering lives of equity-crowdfunded firms.Journal of Corporate Finance,50, 575-591.
  </mixed-citation>
</ref>
<ref id="Suppiah">
  <label>46</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Suppiah, V., &amp; Singh Sandhu, M</person-group>
    <year>2011</year>
    <source>Organisationalculture&apos;s influence on tacit knowledge-sharing behaviour.Journal of knowledge management</source>
    <volume>15</volume>
    <issue>3</issue>
    <fpage>462</fpage>
    <lpage>477</lpage>
    Suppiah, V., &amp; Singh Sandhu, M. (2011). Organisationalculture&apos;s influence on tacit knowledge-sharing behaviour.Journal of knowledge management,15(3), 462-477.
  </mixed-citation>
</ref>
<ref id="Teng">
  <label>47</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Teng, J. T. C. and Song, S</person-group>
    <year>2011</year>
    <article-title>. An exploratory examination of knowledge-sharing behaviours: solicited and voluntary</article-title>
    <source>Journal of Knowledge Management</source>
    <volume>15</volume>
    <issue>1</issue>
    <fpage>104</fpage>
    <lpage>117</lpage>
    Teng, J. T. C. and Song, S. (2011). An exploratory examination of knowledge-sharing behaviours: solicited and voluntary. Journal of Knowledge Management, 15(1), 104-117.
  </mixed-citation>
</ref>
<ref id="Todorovi">
  <label>48</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">TodoroviÃ„Â‡, M. L., PetroviÃ„Â‡, D. Ã„ÂŒ., MihiÃ„Â‡, M. M., ObradoviÃ„Â‡, V. L.,&amp; Bushuyev, S. D</person-group>
    <year>2015</year>
    <source>Project success analysis framework: A knowledge-based approach in project management.International Journal of Project Management</source>
    <volume>33</volume>
    <issue>4</issue>
    <fpage>772</fpage>
    <lpage>783</lpage>
    TodoroviÃ„Â‡, M. L., PetroviÃ„Â‡, D. Ã„ÂŒ., MihiÃ„Â‡, M. M., ObradoviÃ„Â‡, V. L.,&amp; Bushuyev, S. D. (2015). Project success analysis framework: A knowledge-based approach in project management.International Journal of Project Management,33(4), 772-783.
  </mixed-citation>
</ref>
<ref id="Turner">
  <label>49</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Turner, J. R., &amp; MÃƒÂ¼ller, R</person-group>
    <year>2005</year>
    <source>The project manager&apos;s leadership style as a success factor on projects: A literature review.Project management journal</source>
    <volume>36</volume>
    <issue>2</issue>
    <fpage>49</fpage>
    <lpage>61</lpage>
    Turner, J. R., &amp; MÃƒÂ¼ller, R. (2005). The project manager&apos;s leadership style as a success factor on projects: A literature review.Project management journal,36(2), 49-61
  </mixed-citation>
</ref>
<ref id="Wang">
  <label>50</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Wang, D., Su, Z. &amp; Yang, D</person-group>
    <year>2011</year>
    <article-title>. Organizational culture and knowledge creation capability</article-title>
    <source>Journal of Knowledge Management</source>
    <volume>15</volume>
    <issue>3</issue>
    <fpage>363</fpage>
    <lpage>373</lpage>
    Wang, D., Su, Z. &amp; Yang, D. (2011). Organizational culture and knowledge creation capability. Journal of Knowledge Management, 15(3), 363-373
  </mixed-citation>
</ref>
<ref id="Wickramasinghe">
  <label>51</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Wickramasinghe, V., &amp;Widyaratne, R</person-group>
    <year>2012</year>
    <source>Effects of interpersonal trust, team leader support, rewards, and knowledge sharing mechanisms on knowledge sharing in project teams.Vine</source>
    <volume>42</volume>
    <issue>2</issue>
    <fpage>214</fpage>
    <lpage>236</lpage>
    Wickramasinghe, V., &amp;Widyaratne, R. (2012). Effects of interpersonal trust, team leader support, rewards, and knowledge sharing mechanisms on knowledge sharing in project teams.Vine,42(2), 214-236.
  </mixed-citation>
</ref>
<ref id="Williams">
  <label>52</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Williams, T. M</person-group>
    <year>1999</year>
    <source>The need for new paradigms for complex projects.International journal of project management</source>
    <volume>17</volume>
    <issue>5</issue>
    <fpage>269</fpage>
    <lpage>273</lpage>
    Williams, T. M. (1999). The need for new paradigms for complex projects.International journal of project management,17(5), 269-273.
  </mixed-citation>
</ref>
<ref id="Williamson">
  <label>53</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Williamson, D. J</person-group>
    <year>2011</year>
    <source>Acorrelational study assessing the relationships among information technology project complexity, project complication, and project success.Capella Univ., Minneapolis</source>
    <page-range>roject</page-range>
    Williamson, D. J. (2011). Acorrelational study assessing the relationships among information technology project complexity, project complication, and project success.Capella Univ., Minneapolis
  </mixed-citation>
</ref>
<ref id="Xia">
  <label>54</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Xia,W., &amp; Lee, G</person-group>
    <year>2005</year>
    <source>Complexity of information systems development projects: conceptualization and measurement development.Journal of management information systems</source>
    <volume>22</volume>
    <issue>1</issue>
    <fpage>45</fpage>
    <lpage>83</lpage>
    Xia,W., &amp; Lee, G. (2005). Complexity of information systems development projects: conceptualization and measurement development.Journal of management information systems,22(1), 45-83
  </mixed-citation>
</ref>
<ref id="Yatim">
  <label>55</label>
  <mixed-citation publication-type="journal">
    <person-group person-group-type="author">Yatim, F., Bredillet, C. N., &amp; Ruiz, P</person-group>
    <year>2009</year>
    <source>Investigating the deployment of project management: A new perspective based on the concept of certification.International Journal of Managing Projects in Business</source>
    <volume>2</volume>
    <issue>3</issue>
    <fpage>445</fpage>
    <lpage>454</lpage>
    Yatim, F., Bredillet, C. N., &amp; Ruiz, P. (2009). Investigating the deployment of project management: A new perspective based on the concept of certification.International Journal of Managing Projects in Business,2(3), 445-454
  </mixed-citation>
</ref>
</ref-list>
</back>
</article>