Abstract
The Balakot town and its surroundings were almost totally destroyed by Earthquake – 2005. The government has abandoned this town for residential purposes and declared as Red Zones Region. However, the government fully supported post disaster relief and restoration phases. The rehabilitation and reconstruction phases were carried out through community self-help-based system and partially supported by line agencies. This recovery is neither claimed by government nor desired by the community. It is the product of government’s policy, interventions, local economic opportunities, and community self-help-based system. The present study will analyse each step of the recovery through study of the role of different stakeholders and its impacts on recovery process. All data sets are normalized and generalized with regression analysis. This study will generalize the complex process of recovery to reduce the risk of disasters.
Key Words
Earthquake – 2005, Red Zone Region, Disaster Recovery, Restoration, Rehabilitation,
Reconstruction
Introduction
The number and frequency of devastating disasters are at rise in the 21st century. The nature of earthquake hazard is rapid onset disaster due to which it provides least lead time for early warning and evacuation. Consequently, the physical damages, human loss and causalities are much higher than other disaster. However, on other side, it provides opportunity for development particularly of physical infrastructure (Collins, 2009, 2018; Moatty et al., 2017). The process of recovery would be a base for long-term earthquake mitigation and ultimately sustainable development. Among disaster risk reduction (DRR) measures, the most difficult and complex is the change of residents’ location. Resettlement as a DRR measure has a fate of unsuccessful story. Its policy always covers legal ground while the phenomena is too much compound and complex. The land and capital ownership are always addressed in these policies but social and economic issues are always challengeable to address. Recent research shows that understanding of man environment interaction and dynamic recovery measures has positive impacts on this issue (Berke et al., 1993; Phillips, 2015; Smith & Wenger, 2007).
On October 8, 2005, the devastating Earthquake –2005 has totally destroyed the Balakot town and its surrounds. The historical records show that out of tehsil total population, more than 200,000 people were adversely affected by this earthquake. Almost 90 per cent of the physical infrastructure of this region was destroyed. The destruction of physical infrastructure caused disruption in housing, economic activities as well as social instability (Durrani et al., 2005; Hussain & Yeats, 2009; Kaleem et al., 2016). After Earthquake – 2005, the government conducted micro seismic risk assessment. Based on the conclusion that the existing active fault lines has very probability for future earthquakes. Consequently, the government declared the Balakot and its surroundings as red zones, which are unsuitable for residence. This region was called Red Zones of Balakot. The Red Zones Region (RZR) of Balakot included the areas of Balakot, Garlat, Ghoonal, Sathbani and Kewai union councils (UCs). In the RZR of Balakot, three UCs had almost 99 % share of by area and population. These three UCs are Balakot, Garlat and Ghoonal (Government of Pakistan [GOP], 2006; 2007; Platt, 2017; Shafique & Warren, 2015). The RZR of Balakot is located on the merge of two major fault lines which make as wedge. This region has scenic beauty of the river Kunhar which is the part of Lesser Himalaya (Figure 01). It is a historic and a tourist attraction site. Balakot is the tehsil headquarter and served the entire Kunhar valley. It is a nodal point for the River Kunhar valley and work as tourist hub for the entire region. The residents of this RZR of Balakot were enjoying well off economic status and social status in the region (Ali, 2013; GOP, 2000; 2006; Kaleem et al., 2016).
Figure 01: (a) Study Area; (b) Fault Lines Map (c) RZR of the Balakot; and Source: Modified after GOP, 2006
After Earthquake – 2005, the relief and restoration phases of recovery were practiced on the same sites in this region. In rehabilitation phase of a disaster recovery, most of the activities were carried out by Nongovernment Organizations (NGOs) and community self-help-based system. The business activities as well as tehsil headquarter functions were started in the declared RZR of Balakot. With the passage of time, the recovery of the Earthquake – 2005 is muddling. More than a decade time, the residents are still waiting for the allotment in the new Balakot town. People have adopted themselves with the new environment. The reconstruction of businesses and housing has been started on community self-help-based system. The Earthquake - 2005 management authority of Earthquake Reconstruction and Rehabilitation Authority (ERRA) of Pakistan has carried out the recovery programme with “build back better” vision which is internationally recognized. However, the recovery of the RZR of Balakot town is still far away from the all standards of the ERRA’s recovery policy. Certainly, change of location due to risk of disasters is one of the most difficult measures for earthquake DRR. The present study will provide insight of all those measures and outcomes which will enhance the knowledge regarding disaster recovery phase (Ali, 2013; GOP, 2007; Kaleem et al., 2016; Shafique & Warren, 2015).
Conceptual Framework
Recovery of a disaster started after disaster response phase i.e. search and rescue, medical first aid, security and hospital services. Recovery consisted of relief, restoration, rehabilitation and reconstruction phases as well as disaster preparedness. The aim of disaster’s recovery and/or all these sub-phases is to achieve the conditions of prior to disaster. The relief and restoration phases of disaster management are focused on provision of basic amenities of life i.e. food, shelter, civic utilities and services and security. Relief activities are carried out at temporary residence while restoration on permanent one. The living standards of human beings are good indicators of relief and restoration activities. In present study, the conditions of housing and their inside facilities; access to health and education facilities; utilities and transportation facilities are considered as indicators for living standards. In rehabilitation phase of a disaster recovery, the major focus is on the revival of local economy. The local economy is mainly dependent on commercial activities in the RZR of Balakot while agriculture contribution is also conspicuous. Reconstruction is a phase of recovery in which establishment of physical infrastructure of all associated measures are encapsulated. In the RZR of Balakot, this phase of recovery is least supported by line agencies and donors due to RZR of Balakot. The last component of recovery process is disaster preparedness which focused on effective and efficient emergency management system as well as to mitigate the risk of future disasters (Ali, 2013; Collins, 2018; Mayner & Arbon, 2015; Tierney, 1993; United Nations, 2009). In present study, all these components of the recovery process are studies through comparing the pre and post disaster scenario in the RZR of Balakot (Figure 02).
Figure 2
Conceptual Framework of the Study
Research Methodology
The basic purpose of the study is to provide a generalized mechanism for the study of disaster recovery processes. The disaster recovery process is divided into three major phases i.e. response, rehabilitation and reconstruction with fourth supplementary phase of disasters’ preparedness. Each phase has sub sectional activities. In first stage of generalization, equal weightage of 30% is assigned to all major phases while 10% weightage is assigned to disaster’ preparedness phase. In the response phase, the basic amenities of life are measured by quality and access to food, space and other living facilities. The shelters consisted of houses and shops while the provision of water, electricity, fuel, health and education were the major ingredients of civic utilities and services. In addition to these three components, security situation was also considered. Same weightage procedure (basic amenities of life, shelters and civic utilities & services with 30% each and security situation with 10%) is adopted for this phase of the recovery, also. The local economy was studied in rehabilitation phase through basic and non-basic activities with their type and proportion role in the centrality and growth of the town with 50 & 50 % weightage. In the reconstruction phase, the type and vulnerability of the physical infrastructure share the equal weightage. Based on the population number of each category, the houses, shops and civic utilities and services were given 40, 30 and 30 % weightages, respectively. The disasters’ preparedness indicators of knowledge, perception, attitude, training and skills, emergency organizations and equipment were considered in equal weightage in this study (Ali, 2013).
In the RZR of Balakot, the UCs of Balakot, Garlat, and Ghoonal are contiguous and covered the total area of 1450 acres. The UCs of Sathbani and Kewai are isolated from the main region of Balakot with least problem of relocation of their houses. In this study, these three major shareholders UCs were focused for ex post analysis of disaster recovery (Earthquake – 2005) in the RZR of Balakot, Pakistan. Almost 95 % (4244) of the total residential units in the RZR were in these two UCs of Balakot and Garlat (GOP, 2000, 2017). In the RZR of Balakot, there were 4244 household reside in the 42 neighbourhoods (Mohallas). With the 25.3 % of sample size from each neighbourhood, the total of 1050 households were surveyed. In the RZR of Balakot, there were 1500 commercial units in which 1445 shops were located in the Balakot UC. In the field survey, 21 different commercial activities were identified. With stratified random sampling method 300 commercial units were surveyed. The sample size was ±23% from each category. 100 customers and visitors were surveyed through random sampling method.
Figure 3
Number of Households in Neighbourhoods of RZR of Balakot; and Source: GOP, 2006
Detail land use and livelihoods assessment
surveys were carried out. The United States Geological Survey (USGS) free
available Quick Bird image of the region, Google Erath images and National
Engineering Services Pakistan (NESPAK) surveys data & maps were used in
these surveys. All the recordings at maps, cameras, notebook etc were aligned
with the indicators of recovery. The data nature was mostly in the form of
ratio and nominal. The data collected from primary and secondary sources
regarding relief and restoration, rehabilitation, reconstruction as well as
preparedness phases of recovery along with their sub phases were converted into
averages forms. The conditions of these variables were summarized and different
forms of was normalized by
Norms and Vector method (Eq. 01). All variables data are ranged from 1 to 9 through
normalization process. All the four phases of recovery along with their detail
variables were converted to average status table of recovery (Eq. 02). It is
very important to note that the median value “5” is assigned to pre disaster
conditions. Rest of the responses and/or assigned values of each variable is
the existing or post disaster conditions in the recovery process. The
association of pre and post disaster recovery is analysed through statistical
regression model (Eq. 03). The equation may be simplified for simple linear
regression analysis (Eq. 03a). Scattered graph method is used to further verify
the results of regression analysis.
Where as
Post Disaster
Recovery
In the average
index of the variables, ? is the variable and n
represent the total no. of variables j = Number of indicators in each category
(in the present case n = ? = 7)
Whereas: y is a
dependent and x is independent variable which describes a line with slope ? and y intercept ?.
Whereas: rxy
is the slope of the regression line of the standardized data points.
Relief
and Restoration
The government
established relief camps on the same hazardous site after response phase. The
threat of upcoming cold winter season and lack of proper policy guidelines, the
authorities started restoration process on the same site. This decision of
restoration not only encourages the donors’ agencies to start their recovery
projects but also the local community to establish their businesses on the old
site. Fabricated shelters were used for residence, offices, shops and public
buildings & services. The civic services and utilities were immediately
restored on the same site. In this phase of recovery, most of the activities
were supported by donors’ agencies.
The population of Balakot and Garlat were 11,351 and
11,956 in 1998 with 7.0 and 7.2 households’ sizes, respectively. The
predominant trend of plot sizes was 10 Marlas in most of the red zone
area. In 2017 census, their population are 14,681 and 19,513 with 5.59 and 5.58
households’ sizes. The annual percentage growth rate in these two major areas
of red zone of Balakot are 1.35 and 2.58. The household size is deceased while
annual growth rate is increased from the rest of tehsil averages of 6.1 and
1.27, respectively. The status of the RZR of Balakot was well known to
everybody in the region. The economic constraints and nature of RZR discourage
the residents from permanent shelters and/or buildings. The available fabricated shelters were
occupied by the residents with ±90% of the
proportion. These fabricated shelters have typical structure of one kitchen,
two rooms and two washrooms. Most of the residents has the view that these are
unsuitable for family’s livings (Table 01). Most of the commercial units’
structures are also fabricated and they have the same complain.
Table 1. House Vulnerability - Pre and Post Earthquake
- 2005
House Type |
Lesser |
Equal |
Greater |
Total |
Fabricated |
25 |
63 |
932 |
1020 |
RCC |
0 |
4 |
16 |
20 |
Semi RCC |
0 |
1 |
7 |
8 |
Adobe |
0 |
0 |
1 |
1 |
Other |
0 |
0 |
1 |
1 |
Total |
25 |
68 |
957 |
1050 |
Source: Field Data, 2016
Before Earthquake –
2005, the residents of RZR of Balakot were enjoying the quality of civic
utilities. The basic utilities of water, electricity, telecommunication, liquid
petroleum gas (LPG) cylinder, wood, waste disposal system, sewerage, sanitation
and maintenance of neighbourhood’s streets etc. were up to the mark in the pre
earthquake time. The Earthquake – 2005 destroyed the infrastructure as well as
their services of all these civic utilities. In relief and response phase of
Earthquake – 2005, the basic infrastructure of these civic utilities was
restored. However, with the passage of time and RZR limitations, this system
become absolute due to non-maintenance and fabricated shelters. The residents’
response was more critical than commercial sector regarding civic utilities.
The civic services of health, education, government offices, transportation,
and security etc. were functionalized immediately after Earthquake - 2005. Most
of these civic services particularly of government sector are in the fabricated
shelters. In most cases, the quality of services is improved after Earthquake -
2005 like health, government offices, telecommunication and education. The mix
response was observed regarding the civic services in the RZR of Balakot. The
response and observations regarding recreation and security was satisfactory
and almost no change was observed before and after Earthquake - 2005.
Rehabilitation
Rehabilitation is the most difficult phase of recovery in which the local economy needs to start their functioning. The infrastructure of the local economy was totally destroyed by Earthquake – 2005. The rehabilitation in Balakot town is unique one, it was immediately started during early recovery phase due to commercial function of the Balakot town. Interestingly, it was started by self-help-based system of the local community and boomed with the immediate demand of their central functionality and central location of the Balakot town in the river Kunhar valley. The commercial hoteling and tourism are slowly and gradually re-established in the region. The Government’s line agencies support for the civics’ physical infrastructure is very limited in the RZR of Balakot, which inversely affected the businesses in the region. The municipality services are almost abandoned. However, the main road, bridges and embankments along river side are reconstructed.
Figure 4
(a) Commercial Structure of the Balakot Town; (b) Livelihoods Structure in the RZR; and Sources: Field Data, 2016 & GOP, 2006, respectively.
Table 2. Nature of Economic
Activities and Growth of Balakot
S. No. |
Type |
> 95% local |
95% local & 05% Visitors |
75% local & 25% Visitors |
50% local & 50% Visitors |
25% local & 75% Visitors |
05% local & 95% Visitors |
> 95% Visitors |
Total |
1 |
Hoteling |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
100.00 |
100.00 |
2 |
Restaurant |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
100.00 |
100.00 |
3 |
Jewellery |
0.00 |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
0.00 |
100.00 |
4 |
Barber |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
0.00 |
0.00 |
100.00 |
5 |
Cloths |
0.00 |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
0.00 |
100.00 |
6 |
Electronics |
0.00 |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
0.00 |
100.00 |
7 |
General store |
10.99 |
8.79 |
17.58 |
31.87 |
30.77 |
0.00 |
0.00 |
100.00 |
8 |
Shoes |
0.00 |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
0.00 |
100.00 |
9 |
Toys |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
100.00 |
10 |
Sweets & Bakers |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
0.00 |
0.00 |
100.00 |
11 |
Butchers |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
0.00 |
0.00 |
100.00 |
12 |
Bank |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
0.00 |
0.00 |
100.00 |
13 |
Tailors |
0.00 |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
0.00 |
100.00 |
14 |
Gifts |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
0.00 |
100.00 |
100.00 |
15 |
Furniture |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
0.00 |
0.00 |
100.00 |
16 |
Hardware |
0.00 |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
0.00 |
100.00 |
17 |
LPG |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
0.00 |
0.00 |
100.00 |
18 |
Medical Stores |
0.00 |
0.00 |
0.00 |
100.00 |
0.00 |
0.00 |
0.00 |
100.00 |
19 |
Hawkers |
0.00 |
0.00 |
77.78 |
0.00 |
22.22 |
0.00 |
0.00 |
100.00 |
20 |
Vegetables |
0.00 |
0.00 |
92.31 |
0.00 |
7.69 |
0.00 |
0.00 |
100.00 |
21 |
Mis. Activity |
4.00 |
4.00 |
14.00 |
0.00 |
74.00 |
4.00 |
0.00 |
100.00 |
Total |
4.00 |
3.33 |
14.00 |
21.67 |
45.00 |
5.33 |
6.67 |
100.00 |
Source: Field Data, 2016
Reconstruction
Reconstruction is a phase in recovery which
support directly the restoration and rehabilitation phases. However,
reconstruction RZR of Balakot was impassable due to red zone constrains. The
infrastructure of the basic civic services was functionalized in the fabricated
shelters. In the RZR of Balakot, the reconstruction phase was not started. The
situation was deteriorated and agitation was started in local community. In
2010, the Government allocated a budget of Rs. 229 Million for the improvement
of civic infrastructure services. The
housing and commercial infrastructure is developed by local community
self-help-based system and recently in private capacity. With the passage of
time, the conditions of overall living standards, civic utilities and services
are disparaged. This complaint is quite visible in the response of business
community and residents regarding living standards, civic utilities and
services. Certainly, it is the business opportunities which support the
reconstruction in private sector of their houses and commercial units. The
residents of the RZR of Balakot were fully aware about the high seismic risk
associated with this region and also well educated about the resettlement
and/or compensation system from the government. The sole reason for living here
was business and no proper alternative of livelihood. The commercial activities
were started in the fabricated shelters. Those well-known buildings which
withstand with Earthquake – 2005 i.e. Shah
Alam and Madina market were hub of all commercial
activities. With the passage of time and more than decade time, slowly and
gradually reconstruction in the private sector for housing and commercial
activities are started with full boom. The government offices and their
services infrastructure as well as most of the residents are still using the
fabricated shelters.
Disaster Preparedness
Before Earthquake – 2005, there was no emergency
services and/or disaster preparedness in the RZR of Balakot. The Earthquake –
2005 changed the level of knowledge, perception and their attitude regarding
disasters. In the post disaster scenario, the capacity of disaster preparedness
was enhanced through trainings, awareness programmes, availability of equipment
and skilled personals. The disaster emergency response & services centre
was established at Tehsil Municipal Officer (TMO) office, Balakot. This centre
has the limited capacity like Rescue 1122 services which is sufficient for RZR
of Balakot. The knowledge, perception, attitude and practices were changed by
Earthquake -2005 which enhanced the capacity for disaster preparedness. Rescue and
emergency awareness programmes, trainings, drills were practiced in educational
institutions as well as community level. The organization capacity at line
agencies and community level were enhanced up to the mark after Earthquake –
2005.
Generalization of the Recovery
The process of disaster recovery is divided into
four major phases with sub phases and ultimately by 27 indicators. The
weightage of each phase and sub phases of recovery is already in the
methodology section. Consequently, each indicator has its own weightage value
which is based on multiplication of major and sub phase weightage value with
number of indicators in the sub phase of recovery. The data regarding each
indicator is collected through different methods which is explained in the
relevant section of the study. All data sources are converted to normalized
data range with focus on their relation with the major phase of recovery. All
indicators based table is computed with normalized average values, weightage and score of each indicator
(Table 03). The performance of response, rehabilitation, reconstruction and
preparedness are 4.62, 6.38, 2.88 and 8.30, respectively. The role of line
agencies, NGOs and self-help-based system is generalized which shows that only
response and preparedness phases are supported by line agencies and NGOs. The
community was involved in rehabilitation phase through self-help-based system
while reconstruction phase has negligible attention from all stakeholders
(Table 04). This generalized post
disaster scenario is perfectly matching with the data and their description in
the relevant sections.
The post disaster
scenario is based on the pre disaster status of the selected indicators. The
median and average value of normalized values is the best indicator of pre
disaster situation. Thus, the regression analysis plays a central role in the
description of post disaster scenario. The average values of post disaster
indicators are function of pre disaster situation. The values of Multiple R and
R Square are 0.78 and 0.61
which indicates that the indicators of pre and post disaster has strong bond of
association. However, the coefficients
of regression show that all indicators are differently related with each other
as the values of post disaster indicator intercept pre disaster with the
-0.0066 of 1.0339 value. The detail residual analysis of all indicator shows
that response and rehabilitation have strong interdependency while the
reconstruction and preparedness are weakly interconnected. The results are further
verified through scattered graph method which shows same values in the linear
regression expression (Figure 04).
Table 3. Normalized Weightage
Response of Recovery Indicators
Sub
Phase of Recovery |
Indicators |
Normalized
Average |
Weightage
of Indicator |
Score of
Indicators |
|
Response |
Basic Amenities of Life |
Food |
5.50 |
0.03 |
0.17 |
Living
Space |
4.50 |
0.03 |
0.14 |
||
Housing Facilities |
4.40 |
0.03 |
0.13 |
||
Shelters |
Houses |
3.40 |
0.05 |
0.15 |
|
Shops |
3.80 |
0.05 |
0.17 |
||
Civic
Utilities |
Water |
4.50 |
0.02 |
0.07 |
|
Electricity |
5.00 |
0.02 |
0.08 |
||
Miscellaneous |
6.10 |
0.02 |
0.09 |
||
Civic Services |
Health |
6.50 |
0.02 |
0.10 |
|
Education |
4.80 |
0.02 |
0.07 |
||
Miscellaneous |
5.50 |
0.02 |
0.08 |
||
Security
& Recreation |
Security |
5.00 |
0.02 |
0.08 |
|
Recreation |
4.50 |
0.02 |
0.07 |
||
Rehabilitation |
Basic
activities |
Proportion |
7.50 |
0.08 |
0.56 |
Centrality & Growth |
7.70 |
0.08 |
0.58 |
||
Non-Basic
activities |
Proportion |
5.10 |
0.08 |
0.38 |
|
Centrality & Growth |
5.20 |
0.08 |
0.39 |
||
Reconstruction |
Houses |
Type |
2.50 |
0.05 |
0.13 |
Vulnerability |
2.00 |
0.05 |
0.10 |
||
Shops |
Type |
3.70 |
0.05 |
0.19 |
|
Vulnerability |
3.10 |
0.05 |
0.16 |
||
Infra-structurer
of Civic Utilities & Services |
Type |
1.50 |
0.05 |
0.08 |
|
Vulnerability |
4.50 |
0.05 |
0.23 |
||
Preparedness |
Knowledge,
Perception and Attitude |
9.00 |
0.03 |
0.23 |
|
Training & Skills |
8.50 |
0.03 |
0.21 |
||
Emergency
Organizations |
7.50 |
0.03 |
0.19 |
||
Equipment & Resources |
8.20 |
0.03 |
0.21 |
||
G.
Total |
139.50 |
1.00 |
4.99 |
Source: Field Data, 2016
Table 4. Support of
Stakeholders in the Recovery Indicators
Phases of Recovery |
Sub Phase of Recovery |
Line Agencies & NGOs |
Self-help-based |
Response |
Basic Amenities of Life |
9 |
1 |
Shelters |
7.5 |
2.5 |
|
Civic Utilities |
6.1 |
2.5 |
|
Civic
Services |
6.5 |
2.5 |
|
Security & Recreation |
1 |
1 |
|
Total |
9.03 |
2.85 |
|
Rehabilitation |
Basic activities |
1 |
8.2 |
Non-Basic
activities |
1 |
7.8 |
|
Total |
0.6 |
4.8 |
|
Reconstruction |
Houses |
1 |
3.5 |
Shops |
1 |
4.5 |
|
Infrastructure
of Civic Utilities and Services |
5 |
1.5 |
|
Total |
2.1 |
2.85 |
|
Preparedness |
Knowledge,
Perception and Attitude |
6 |
1 |
Training and Skills |
6.5 |
1 |
|
Emergency
Organizations |
7.2 |
1 |
|
Equipment |
8.5 |
1 |
|
Total |
2.82 |
0.4 |
|
Overall Total |
14.55 |
10.9 |
Source: Field Data,
2016
Figure 5
Scattered Graph of Pre and Post Disaster Indicators; and Source: Field Data, 2016
Conclusion
The disaster recovery process is schematically divided into phases and sub phases with 27 indicators, which covers all aspect of the recovery. The theoretical base of the study explains the importance of each indicator and provide a base for the weightage of each indicator. The diverse nature of indicators compels the study to use different method for data collection and description. The study reveals that RZR of Balakot has two important aspects i.e. unsuitable for residence and unmatchable situation for businesses. These two contrast characteristics make it attractable for local community due to businesses and least focused in development of physical infrastructure by line agencies due to red zones limitations. Consequently, the response phase and all of its indicators show tremendous progress and development. The rehabilitation is indirectly supported by line agencies and directly by local community due to their businesses. The preparedness for disasters is totally new intervention in the capacity enhancement of the community which has very positive impacts on the recovery of Earthquake – 2005. The reconstruction phase has worse scenario at all stakeholders’ level. This recovery is contrast to the vision of ERRA, which claim “Built Back Better”.
The division of recovery process into phases, sub phases and indicators make it very generalized for the analysis of other disaster recovery processes which are in the focus. It is obvious that all recovery processes will follow the same path of assessment. The most important aspect of this generalization is the methodological framework for the weightage of each indicator and its calculation. In the light of stakeholder function, the performance of each indicator can be assessed through number of methodologies. The indicators represent the sub phase which contribute to major phase of recovery and ultimately the overall recovery process. This method of generalization has the strength to reflect the intra phase’s diversities. On one hand, it has ability to describe the total recovery of RZR of Balakot and on other hand shows discrepancies in different phases of the recovery. The recovery of the RZR of Balakot has the value of 5, which shows mix conditions of post-Earthquake – 2005 with grater similarity of pre earthquake conditions. The regression model and individual values of major phases of disaster recovery revealed that development is totally uneven in different phases of recovery. It also indicates the areas which need future attention for development and converting opportunity of disaster recovery to resilience.
References
- Ali, A. (2013). Resettlement of the Balakot Town: Problems and Prospects.(Ph. D.), University of Peshawar, Peshawar
- Berke, P. R., Kartez, J., & Wenger, D. (1993). Recovery after disaster: achieving sustainable development, mitigation and equity. Disasters, 17(2), 93-109.
- Collins, A. E. (2009). Disaster and development: Routledge
- Collins, A. E. (2018). Advancing the Disaster and Development Paradigm. International Journal of Disaster Risk Science, 9(4), 486-495
- Durrani, A. J., Elnashai, A. S., Hashash, Y., Kim, S. J., & Masud, A. (2005). The Kashmir earthquake of October 8, 2005: A quick look report. MAE Center CD Release 05-04
- Government of Pakistan (GOP). (2000). District Census Report of Mansehera. Islamabad, Pakistan: Statistic Division Population Census Organization, Printing Press, Islamabad, Pakistan
- Government of Pakistan (GOP). (2006). Annual Review 2005 to 2006: Rebuild, Revive With Dignity & Hope. Retrieved from Islamabad: http://www.erra.pk/Reports/ERRA-Review-200506.pdf
- Government of Pakistan (GOP). (2007). Build Back Better Planned Cities. Retrieved from Prime Minister's Secretariat, Islamabad
- Government of Pakistan (GOP). (2017). Pakistan Tehsil Wise Census 2017. Retrieved from Islamabad: http://www.pbscensus.gov.pk/sites/default/files/PAKISTAN TEHSIL WISE FOR WEB CENSUS_2017.pdf
- Hussain, A., & Yeats, R. S. (2009). Geological setting of the 8 October 2005 Kashmir earthquake. Journal of seismology, 13(3), 315-325 http://www.pbscensus.gov.pk/sites/default/files/PAKISTAN TEHSIL WISE FOR WEB CENSUS_2017.pdf
- Kaleem, M., Safdar, S., & Ali, A. (2016). The Role of Traditional Social Network in the Disaster's Vulnerabilities Reduction: Study of Pakistan's earthquake 2005 disaster. FWU Journal of Social Sciences, 10(1), 108
- Mayner, L., & Arbon, P. (2015). Defining disaster: The need for harmonisation of terminology. Australasian Journal of Disaster & Trauma Studies, 19
- Moatty, A., Gaillard, J.-C., & Vinet, F. (2017). From disaster to development: Challenges and Opportunities of the Post-Disaster Recovery.Paper presented at the Annales de géographie
- Phillips, B. D. (2015). Disaster recovery: CRC press
- Platt, S. (2017). Meta-decision-making and the speed and quality of disaster resilience and recovery Governing for Resilience in Vulnerable Places(pp. 116-145): Routledge
- Shafique, K., & Warren, C. M. (2015). Significance of community participation in success of post natural disaster reconstruction project-evidence from developing country.Paper presented at the 5th International Conference on Building Resilience
- Smith, G. P., & Wenger, D. (2007). Sustainable disaster recovery: Operationalizing an existing agenda Handbook of disaster research(pp. 234-257): Springer
- Tierney, K. J. (1993). Disaster preparedness and response: Research findings and guidance from the social science literature
- United Nations. (2009). UNISDR terminology on disaster risk reduction. United Nations Office for Disaster Risk Reduction, report.
- Ali, A. (2013). Resettlement of the Balakot Town: Problems and Prospects.(Ph. D.), University of Peshawar, Peshawar
- Berke, P. R., Kartez, J., & Wenger, D. (1993). Recovery after disaster: achieving sustainable development, mitigation and equity. Disasters, 17(2), 93-109.
- Collins, A. E. (2009). Disaster and development: Routledge
- Collins, A. E. (2018). Advancing the Disaster and Development Paradigm. International Journal of Disaster Risk Science, 9(4), 486-495
- Durrani, A. J., Elnashai, A. S., Hashash, Y., Kim, S. J., & Masud, A. (2005). The Kashmir earthquake of October 8, 2005: A quick look report. MAE Center CD Release 05-04
- Government of Pakistan (GOP). (2000). District Census Report of Mansehera. Islamabad, Pakistan: Statistic Division Population Census Organization, Printing Press, Islamabad, Pakistan
- Government of Pakistan (GOP). (2006). Annual Review 2005 to 2006: Rebuild, Revive With Dignity & Hope. Retrieved from Islamabad: http://www.erra.pk/Reports/ERRA-Review-200506.pdf
- Government of Pakistan (GOP). (2007). Build Back Better Planned Cities. Retrieved from Prime Minister's Secretariat, Islamabad
- Government of Pakistan (GOP). (2017). Pakistan Tehsil Wise Census 2017. Retrieved from Islamabad: http://www.pbscensus.gov.pk/sites/default/files/PAKISTAN TEHSIL WISE FOR WEB CENSUS_2017.pdf
- Hussain, A., & Yeats, R. S. (2009). Geological setting of the 8 October 2005 Kashmir earthquake. Journal of seismology, 13(3), 315-325 http://www.pbscensus.gov.pk/sites/default/files/PAKISTAN TEHSIL WISE FOR WEB CENSUS_2017.pdf
- Kaleem, M., Safdar, S., & Ali, A. (2016). The Role of Traditional Social Network in the Disaster's Vulnerabilities Reduction: Study of Pakistan's earthquake 2005 disaster. FWU Journal of Social Sciences, 10(1), 108
- Mayner, L., & Arbon, P. (2015). Defining disaster: The need for harmonisation of terminology. Australasian Journal of Disaster & Trauma Studies, 19
- Moatty, A., Gaillard, J.-C., & Vinet, F. (2017). From disaster to development: Challenges and Opportunities of the Post-Disaster Recovery.Paper presented at the Annales de géographie
- Phillips, B. D. (2015). Disaster recovery: CRC press
- Platt, S. (2017). Meta-decision-making and the speed and quality of disaster resilience and recovery Governing for Resilience in Vulnerable Places(pp. 116-145): Routledge
- Shafique, K., & Warren, C. M. (2015). Significance of community participation in success of post natural disaster reconstruction project-evidence from developing country.Paper presented at the 5th International Conference on Building Resilience
- Smith, G. P., & Wenger, D. (2007). Sustainable disaster recovery: Operationalizing an existing agenda Handbook of disaster research(pp. 234-257): Springer
- Tierney, K. J. (1993). Disaster preparedness and response: Research findings and guidance from the social science literature
- United Nations. (2009). UNISDR terminology on disaster risk reduction. United Nations Office for Disaster Risk Reduction, report.
Cite this article
-
APA : Ali, A., Malik, S. M., & Jan, M. A. (2019). Ex Post Analysis of Disaster Recovery (Earthquake-2005) in the Red Zones Region of Balakot, Pakistan. Global Regional Review, IV(II), 243-253. https://doi.org/10.31703/grr.2019(IV-II).26
-
CHICAGO : Ali, Amjad, Sher Muhammad Malik, and Mushtaq Ahmad Jan. 2019. "Ex Post Analysis of Disaster Recovery (Earthquake-2005) in the Red Zones Region of Balakot, Pakistan." Global Regional Review, IV (II): 243-253 doi: 10.31703/grr.2019(IV-II).26
-
HARVARD : ALI, A., MALIK, S. M. & JAN, M. A. 2019. Ex Post Analysis of Disaster Recovery (Earthquake-2005) in the Red Zones Region of Balakot, Pakistan. Global Regional Review, IV, 243-253.
-
MHRA : Ali, Amjad, Sher Muhammad Malik, and Mushtaq Ahmad Jan. 2019. "Ex Post Analysis of Disaster Recovery (Earthquake-2005) in the Red Zones Region of Balakot, Pakistan." Global Regional Review, IV: 243-253
-
MLA : Ali, Amjad, Sher Muhammad Malik, and Mushtaq Ahmad Jan. "Ex Post Analysis of Disaster Recovery (Earthquake-2005) in the Red Zones Region of Balakot, Pakistan." Global Regional Review, IV.II (2019): 243-253 Print.
-
OXFORD : Ali, Amjad, Malik, Sher Muhammad, and Jan, Mushtaq Ahmad (2019), "Ex Post Analysis of Disaster Recovery (Earthquake-2005) in the Red Zones Region of Balakot, Pakistan", Global Regional Review, IV (II), 243-253
-
TURABIAN : Ali, Amjad, Sher Muhammad Malik, and Mushtaq Ahmad Jan. "Ex Post Analysis of Disaster Recovery (Earthquake-2005) in the Red Zones Region of Balakot, Pakistan." Global Regional Review IV, no. II (2019): 243-253. https://doi.org/10.31703/grr.2019(IV-II).26